![]()
§ 105.46. Implementation of erosion and sedimentation control plans.
(a) During the construction of a dam, water obstruction or encroachment, the permittee shall follow the erosion and sedimentation control plan prepared in accordance with Chapter 102 (relating to erosion and sediment control) and submitted with and approved as part of his application.
(b) Construction shall be done in a manner so as to minimize erosion of banks and bed of the stream and disturbance of the regimen of the stream.
Source The provisions of this § 105.46 adopted September 26, 1980, effective September 27, 1980, 10 Pa.B. 3843.
No part of the information on this site may be reproduced for profit or sold for profit.
This material has been drawn directly from the official Pennsylvania Code full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.