Subchapter F. OPERATING PERMIT REQUIREMENTS
GENERAL Sec.
127.401. Scope.
127.402. General provisions.
127.403. Permitting of sources operating lawfully without a permit.
127.404. Compliance schedule for repermitting.
PERMIT APPLICATIONS
127.411. Content of applications.
127.412. Compliance review forms.
127.413. Municipal notification.
127.414. Supplemental information.
REVIEW OF APPLICATIONS
127.421. Review of applications.
127.422. Denial of permits.
127.423. Notice of basis for certain operating permit decisions.
127.424. Public notice.
127.425. Contents of notice.
127.426. Filing protests.
127.427. Consideration of protest.
127.428. Conferences and hearings.
127.429. Conference or hearing procedure.
127.430. Conference or hearing record.
127.431. Operating permit disposition.
OPERATING PERMIT CONDITIONS
127.441. Operating permit terms and conditions.
127.442. Reporting requirements.
127.443. Operating permit requirements.
127.444. Compliance requirements.
127.445. Operating permit compliance schedules.
127.446. Operating permit duration.
127.447. Alternate operating scenarios.
127.448. Emissions trading at facilities with Federally enforceable emissions cap.
127.449. De minimis emission increases.
127.450. Administrative operating permit amendments.
OPERATING PERMIT MODIFICATIONS
127.461. Operating permit changes for cause.
127.462. Minor operating permit modifications.
127.463. Operating permit revisions to incorporate applicable standards.
127.464. Transfer of operating permits.
Source The provisions of this Subchapter F adopted November 25, 1994, effective November 26, 1994, 24 Pa.B. 5899, unless otherwise noted.
Cross References This subchapter cited in 25 Pa. Code § 127.12b (relating to plan approval terms and conditions); and 25 Pa. Code § 127.501 (relating to scope).
GENERAL
§ 127.401. Scope.
This subchapter is applicable to sources required to obtain an operating permit under the act.
§ 127.402. General provisions.
(a) A person may not operate a stationary air contamination source unless the Department has issued to the person a permit to operate the source under this article in response to a written application for a permit submitted on forms and containing the information the Department may prescribe.
(b) The Department will provide public notice and the right to comment on each permit prior to issuance or denial and may hold public hearings concerning a permit.
(c) A permit may be issued to an applicant for a stationary air contamination source requiring construction, assembly, installation, reactivation or modification when the requirements of this article related to operating requirements have been met and there has been performed upon the source a test or evaluation which satisfies the Department that the air contamination source will not discharge into the outdoor atmosphere an air contaminant at a rate in excess of that permitted by applicable regulations under this article, or in violation of a performance or emission standard or other requirements established by the EPA or the Department for the source, and will not cause air pollution.
(d) An application, form, report or compliance certification submitted under this subchapter shall contain certification by a responsible official as to truth, accuracy and completeness. This certification and other certification required under this subchapter shall state that, based on information and belief formed after reasonable inquiry, the statements and information in the document are true, accurate and complete.
§ 127.403. Permitting of sources operating lawfully without a permit.
(a) A stationary air contamination source operating lawfully without a permit for which fees required by Subchapter I (relating to plan approval and operating permit fees) have been paid is authorized to continue to operate without a permit until 120 days after the Department provides notice to the source that a permit application is required or until November 1, 1996, whichever occurs first.
(b) If the applicant submits a complete permit application within the time frame required by this section and the Department fails to issue a permit through no fault of the applicant, the source may continue to operate if the fees required by Subchapter I have been paid and the source is operated in conformance with the act, the Clean Air Act and the regulations thereunder.
(c) For a performance or emission standard or other requirement established by the EPA or the Department for the source subsequent to July 9, 1992, but prior to the permit issuance date, the permit may contain a compliance schedule authorizing the source to operate out of compliance and requiring the source to achieve compliance as soon as possible but no later than the time required by the act, the Clean Air Act or the regulations thereunder.
(d) For the purposes of this section, a source is operating lawfully without a permit if it is a source for which no permit was previously required and the source is operating in compliance with applicable regulatory requirements.
§ 127.404. Compliance schedule for repermitting.
A new permit issued to a source which is operating under a valid permit on July 9, 1992, or which has received a permit subsequent to July 9, 1992, and which is required to meet performance or emission standards or other requirements established subsequent to the issuance of the existing permit, may contain a compliance schedule authorizing the source to continue to operate out of compliance and requiring the source to achieve compliance as soon as possible but no later than the time required by the act, the Clean Air Act or the regulations thereunder.
PERMIT APPLICATIONS.
§ 127.411. Content of applications.
(a) An application for an operating permit shall:
(1) Identify the location of the source and the name, title, address and telephone number of the individual responsible for the operation of the source.
(2) Contain information that is requested by the Department and is necessary to perform a thorough evaluation of the air contamination aspects of the source.
(3) Include the information contained in the plan approval application.
(4) Demonstrate that:
(i) The source is equipped with reasonable and adequate facilities to monitor and record the emissions of air contaminants and the operating conditions which may affect the emissions of air contaminants.
(ii) The records are being and will continue to be maintained.
(iii) The records will be submitted to the Department at specified intervals or upon request.
(5) Demonstrate that the source is complying with applicable requirements of this article and requirements promulgated by the Administrator of the EPA under the Clean Air Act.
(6) Demonstrate that the emissions from a new source are the minimum attainable through the use of the best available technology as required by the plan approval.
(7) Demonstrate that the source is not preventing or adversely affecting the attainment or maintenance of ambient air quality standards when requested by the Department.
(8) Contain a plan of action for the reduction of emissions during each level specified in Chapter 137 (relating to air pollution episodes) when required by the Department.
(9) Demonstrate that the provisions of § 127.413 (relating to municipal notification) have been met. The applicant shall submit a copy of the notification letter and proof that the notice was received.
(10) Contain a plan for dealing with air pollution emergencies, when requested by the Department or when required by the Clean Air Act or the regulations adopted under the act or the Clean Air Act.
(11) Demonstrate that the source and the air cleaning devices are being and will be operated and maintained in accordance with good air pollution control practices.
(12) Contain a completed compliance review form or reference the most recently submitted compliance review form for facilities submitting compliance review forms on a periodic basis.
(b) The Department will not approve an application which fails to meet the requirements of subsection (a).
(c) The records, reports or information obtained by the Department or referred to at public hearings shall be available to the public, except as provided in subsection (d).
(d) Upon cause shown by any person that the records, reports or information, or a particular portion thereof, but not emission data, to which the Department has access under the provisions of the act, if made public, would divulge production or sales figures or methods, processes or production unique to that person or would otherwise tend to affect adversely the competitive position of that person by revealing trade secrets, including intellectual property rights, the Department will consider the record, report or information, or particular portion thereof confidential in the administration of the act. The Department will implement this section consistent with sections 112(d) and 114(c) of the Clean Air Act (42 U.S.C.A. § § 7412(d) and 7414(c)). Nothing in this section prevents the disclosure of the report, record or information to Federal, State or local representatives as necessary for purposes of administration of Federal, State or local air pollution control laws, or when relevant in any proceeding under the act.
§ 127.412. Compliance review forms.
(a) This section establishes the compliance review procedures applicable during the review of an application for an operating permit, including a general operating permit.
(b) Each applicant for an operating permit shall, as part of the application or on a periodic basis as authorized under subsection (j), submit a compliance review on a form provided by the Department signed by a corporate officer or other responsible official of the facility and containing a verification that the information contained in the application is true and correct to the best of the signatorys belief formed after reasonable inquiry.
(c) The compliance review form shall provide information related to the compliance status of the applicant and related parties including the following:
(1) The name, address, telephone number, taxpayer identification number and plan approval or application number.
(2) The form of management under which the applicant conducts its business and a brief description of the types of business activities performed.
(3) The name and location, including both the address and the municipality and county, telephone number and relationship to the applicant (parent, subsidiary or general partner) of all related parties in this Commonwealth.
(4) The name and business address of the plant manager and general partner of the applicant.
(5) A list of plan approvals and operating permits issued by the Department or the Allegheny County or Philadelphia County air pollution control agencies to the applicant or related parties that are in effect at the time of application or were in effect during the previous 5 years. The list shall include each plan approval and operating permit number, locations and expiration dates.
(6) A list of documented conduct and deviations by the applicant or a related party. The list shall include the date, location, plan approval or operating permit number, nature of the documented conduct or deviation, and the incident statuslitigation, existing/continuing, corrected and date of correction. Unless specifically required by the Department, the applicant is not required to report deviations which have been previously reported to the Department in writing under the requirements of this title related to monitoring and reporting requirements.
(d) The applicant shall update the compliance review form if documented conduct or deviations occur from the date of the submission of the application through the date of operating permit issuance.
(e) The Department may establish a supplemental compliance review form that may be used to update information submitted on the compliance review form.
(f) If the Department finds that the applicant or related party has an existing or continuing violation or lacks the intention or ability to comply with the act, or the rules or regulations promulgated under the act, or a plan approval operating permit or order of the Department, as indicated by past or present violations, the Department will attempt to resolve the violations or lack of intention or ability to comply informally.
(g) If the Department is unable to resolve the violation or lack of intention or ability to comply on an informal basis, the Department will place the violation and may place the lack of intention or ability to comply on the compliance docket. The violation or lack of intention or ability to comply shall remain on the compliance docket until it is resolved to the satisfaction of the Department.
(h) An operating permit will not be issued to an applicant or related party if a violation or lack of intention or ability to comply at a source owned or operated by the applicant or a related party appears on the compliance docket.
(i) A permittee or applicant may appeal to the EHB a violation or lack of intention or ability to comply which the Department places on the compliance docket.
(j) Other provisions of this section notwithstanding, a source may, upon approval by the Department, submit the compliance review form required by this section on a periodic basis of not less than once every 6 months. The owners and operators of the facility shall make an election to submit the compliance review information on a periodic basis or as part of the operating permit application with the submission of the first operating permit filed after November 26, 1994, or by making an election in writing by May 26, 1995. The facility may only change the election with the approval of the Department in writing or upon renewal of the first filed permit or a Title V permit.
(k) The owners and operators of the facility shall have reasonable procedures in place to insure that documented conduct and deviations are identified and made part of the compliance review information submitted to the Department.
Cross References This section cited in 25 Pa. Code § 127.464 (relating to transfer of operating permits).
§ 127.413. Municipal notification.
The applicant for an operating permit shall notify the local municipality and county where the air pollution source is to be located that the applicant has applied for the operating permit. The notification shall clearly describe the source and modifications that are to take place. The notice shall state that there is a 30-day comment period which begins upon receipt of the notice by the municipality and county.
Cross References This section cited in 25 Pa. Code § 127.411 (relating to content of applications).
§ 127.414. Supplemental information.
(a) The applicant shall provide additional information as necessary to address requirements that become applicable to the source after the date it files a complete application but prior to the Department taking action on the permit application.
(b) The applicant shall provide supplementary facts or corrected information upon becoming aware that it has submitted incorrect information or failed to submit relevant facts.
(c) Except as otherwise required by this article, the Clean Air Act or the regulations thereunder, the permittee shall submit additional information as necessary to address changes occurring at the source after the date it files a complete application but prior to the Department taking action on the permit application.
(d) The applicant shall submit information requested by the Department which is necessary to evaluate the permit application.
REVIEW OF APPLICATIONS
§ 127.421. Review of applications.
(a) The Department will determine if an application is complete within 60 days from receipt of the application. An application is complete if it contains sufficient information to begin processing the application, has the applicable sections completed and has been signed by a responsible official.
(b) Except as provided in subsections (c) and (d), the Department will approve or disapprove a complete application within 18 months after the date of receipt of a complete application.
(c) The Department will establish a phased schedule for acting on permit applications received within the first 12 months after the approval from the EPA of the Title V permit program established to implement the Clean Air Act.
(d) The schedule established under subsection (c) shall assure that at least one third of the permit applications will be acted upon by the Department annually over a period not to exceed 3 years.
(e) The submission of a complete application does not affect the requirement to obtain a plan approval as required by this chapter.
Cross References This section cited in 25 Pa. Code § 127.505 (relating to initial application submitted for Title V facilities).
§ 127.422. Denial of permits.
The Department will deny or refuse to revise or renew an operating permit to a source to which one or more of the following applies:
(1) The Department has determined it is likely to cause air pollution or to violate the act, the Clean Air Act or the regulations thereunder applicable to the source.
(2) In the design of the source, provision is not made for adequate verification of compliance, including source testing or alternative means to verify compliance.
(3) The EPA has notified the Department in writing that the permit is not in compliance with the requirements of the Clean Air Act or the regulations thereunder.
(4) The applicant has constructed, installed, modified or operated an air contamination source or installed air pollution control equipment or devices on the source contrary to the plans and specifications approved by the Department.
(5) The applicant or a related party has a violation or lack of intention or ability to comply that is listed on the compliance docket.
§ 127.423. Notice of basis for certain operating permit decisions.
(a) When the Department refuses to grant an approval or to issue or reissue a permit or to terminate, modify, suspend or revoke an operating permit already issued, the action will be in the form of a written notice to the person affected informing the person of the action taken by the Department and setting forth in the notice a full and complete statement of the reasons for the action.
(b) The notice required by subsection (a) will be served upon the person affected either by hand delivery or by certified mail return receipt requested.
(c) The action set forth in the notice shall be final and not subject to review unless, within 30 days of the service of the notice, a person affected thereby appeals to the EHB setting forth the grounds relied upon.
This section cited in 25 Pa. Code § 127.218 (relating to PALs); 25 Pa. Code § 127.425 (relating to contents of notice); and 25 Pa. Code § 127.426 (relating to filing protests).
§ 127.425. Contents of notice.
The notice required by § 127.424 (relating to public notice) shall include the following:
(1) The name and address of the applicant.
(2) The location and name of the plant or facility at which operation of the source will take place.
(3) The type and quantity of air contaminants being emitted.
(4) A brief description of the conditions being placed in the permit.
(5) A description of the procedures for reaching a final decision on the proposed permit action including the following:
(i) The ending date of the receipt of written protests.
(ii) The procedures for requesting a hearing and the nature of that hearing.
(iii) Other procedures by which the public may participate in the final decision.
(6) The name and telephone number of a person to contact for additional information.
(7) A statement that a person may object to the operating permit or a proposed condition thereof by filing a written protest with the Department at the appropriate regional offices described in § 121.4 (relating to regional organization of the Department).
§ 127.426. Filing protests.
(a) A protest to a proposed action shall be filed with the Department within 30 days of the date that notice of the proposed action was published under § 127.424 (relating to public notice).
(b) A protest shall include the following:
(1) The name, address and telephone number of the person filing the protest.
(2) An identification of the proposed permit issuance being opposed.
(3) A concise statement of the objections to the permit issuance and the relevant facts upon which the objections are based.
Cross References This section cited in 25 Pa. Code § 127.427 (relating to consideration of protest); 25 Pa. Code § 127.428 (relating to conferences and hearings); and 25 Pa. Code § 127.431 (relating to operating permit disposition).
§ 127.427. Consideration of protest.
(a) A protest alerts the Department to the fact and nature of the objection of the protestant to the proposed action on the application.
(b) The Department is not required to consider protests filed subsequent to the time designated in § 127.426 (relating to filing protests), but it may consider them if filed prior to issuance of an operating permit.
§ 127.428. Conferences and hearings.
(a) Prior to issuing an operating permit, the Department may hold a fact-finding conference or hearing at which the petitioner, and a person who has properly filed a protest under § 127.426 (relating to filing protests) may appear and give testimony. The Department is not required to hold a conference or hearing.
(b) The applicant, the protestant and other participants will be notified of the time, place and purpose of a conference or hearing, in writing or by publication in a newspaper or the Pennsylvania Bulletin, unless the Department determines that notification by telephone will be sufficient.
§ 127.429. Conference or hearing procedure.
(a) Conferences and hearings shall be conducted by a presiding officer.
(b) Except if provided otherwise in the notice or by the presiding officer, conferences and hearings shall be conducted in an informal manner and the rules of evidence are not applicable.
(c) When provided in the notice, a participant may be required to present a written statement, together with exhibits required, at the conference or hearing for the use of the participants. Persons unable to attend the conference or hearing may submit three copies of a written statement and exhibits within 10 days thereafter to the Department.
(d) At the conference or hearing, a participant, may, at his own cost, record the proceedings using a stenographer, tape recorder or other means.
§ 127.430. Conference or hearing record.
(a) Following the conference or hearing, the presiding officer shall prepare a summary which contains the following:
(1) An identification of the operating permit application and the name of the plant or facility which is being constructed or modified.
(2) The names and addresses of each participant and whom the participant represents.
(3) The substance of the opening and closing statement by the presiding officer.
(4) The substance of the matters discussed or testified to and agreements entered into by the participants.
(5) Other relevant matters to inform the Department of the results of the conference or hearing.
(b) A copy of the summary shall be submitted upon request to each participant in the proceeding. Copies of the summary, together with any transcript of the proceedings, written statements, exhibits and protests will also be placed in the file in the appropriate office in the Department for review by the participants prior to disposition of the operating permit application.
§ 127.431. Operating permit disposition.
(a) After reviewing a protest or record of a conference or hearing, the Department may take action authorized by this chapter.
(b) A notice of denial or an operating permit will be issued to the applicant. Each protestant who has submitted a comment within the time period in § 127.426 (relating to filing protests) will be notified personally or by mailing a copy of the plan approval disposition to the address set forth in the protest.
(c) The Department will also publish notice of its action in the Pennsylvania Bulletin which will be deemed to be sufficient notice to others.
OPERATING PERMIT CONDITIONS
§ 127.441. Operating permit terms and conditions.
(a) A permit may contain terms and conditions the Department deems necessary to assure the proper operation of the source.
(b) At a minimum, each permit shall incorporate by reference the emission and performance standards and other requirements of the act, the Clean Air Act or the regulations thereunder.
(c) The operating permit shall incorporate the monitoring, recordkeeping and reporting requirements required by Chapter 139 (relating to sampling and testing) and other monitoring, recordkeeping or reporting requirements of this article and additional requirements related to monitoring, recordkeeping and reporting required by the Clean Air Act and the regulations thereunder including, if applicable, the enhanced monitoring requirements of 40 CFR Part 64 (relating to enhanced monitoring).
(d) The permit shall contain a requirement that the permittee develop an accidental release program consistent with the Clean Air Act and the regulations thereunder.
§ 127.442. Reporting requirements.
(a) Each source shall submit reports to the Department containing information the Department may prescribe relative to the operation and maintenance of the source.
(b) At a minimum, each permit shall incorporate by reference the reporting requirements of the act, the Clean Air Act or the regulations thereunder applicable to the source.
§ 127.443. Operating permit requirements.
(a) A person may not cause or permit the operation of a source the construction, modification or reactivation of which, or the installation of an air cleaning device on which, is subject to § 127.11 (relating to plan approval requirements), unless the Department has issued a permit to operate the source.
(b) The permit shall be issued with the condition that the source shall operate in compliance with the plan approval, the conditions of the plan approval and the conditions of the operating permit. The Department may issue the permit with additional appropriate conditions.
(c) The Department will not issue an operating permit unless the source was constructed in accordance with the plan approval and the conditions of the plan approval.
§ 127.444. Compliance requirements.
A person may not cause or permit the operation of a source subject to this article unless the source and air cleaning devices identified in the application for the plan approval and operating permit and the plan approval issued to the source are operated and maintained in accordance with specifications in the application and conditions in the plan approval and operating permit issued by the Department. A person may not cause or permit the operation of an air contamination source subject to this chapter in a manner inconsistent with good operating practices.
§ 127.445. Operating permit compliance schedules.
(a) The Department may issue an operating permit to an existing and operating source that is out of compliance with the act, the Clean Air Act or the regulations thereunder.
(b) An operating permit issued under subsection (a) shall contain an enforceable schedule requiring the source to attain compliance as soon as possible but no later than the date required by the act or the Clean Air Act.
(c) The compliance schedule required by subsection (b) may contain interim milestone dates for completing any phase of the required work, as well as a final compliance date and may contain stipulated penalties for the failure to meet the compliance schedule.
(d) If the permittee fails to achieve compliance by the final compliance date or fails to pay the stipulated penalties for failure to meet an interim compliance date, the permit shall be revoked.
(e) The operating permit shall be part of an overall resolution of the outstanding noncompliance and may include the payment of an appropriate civil penalty for past violations and shall contain other terms and conditions the Department deems appropriate.
(f) An operating permit may incorporate by reference a compliance schedule contained within a consent order and agreement, including provisions related to the implementation or enforcement of the compliance schedule or consent order and agreement.
Cross References This section cited in 25 Pa. Code § 127.513 (relating to compliance certification).
§ 127.446. Operating permit duration.
(a) An operating permit issued under this chapter will be issued for a 5-year term unless a shorter term is required to comply with the Clean Air Act or the regulations thereunder or the permittee requests a shorter term.
(b) Notwithstanding subsection (a), a permit for acid deposition control will be issued for a 5-year term.
(c) The terms and conditions of an expired permit are automatically continued pending the issuance of a new permit when the permittee has submitted a timely and complete application and paid the fees required by Subchapter I (relating to plan approval and operating permit fees) and the Department is unable, through no fault of the permittee, to issue or deny a new permit before the expiration of the previous permit. An application is complete if it contains sufficient information to begin processing the application, has the applicable sections completed and has been signed by a responsible official.
(d) Failure of the Department to issue or deny a new permit prior to the expiration date of the previous permit for which a timely renewal application has been filed shall be an appealable action. The EHB may require that the Department take action on an application without delay.
(e) Applications for permit renewals shall be submitted at least 6 and not more than 18 months before expiration of the existing permit.
§ 127.447. Alternate operating scenarios.
(a) Stationary air contamination sources may make changes at a facility to implement alternate operating scenarios identified in its permit under this section.
(b) A permit issued under this section shall contain terms and conditions for reasonably anticipated operating scenarios determined to be necessary or otherwise identified by the source in its application as approved by the Department. The terms and conditions:
(1) Shall require the source, contemporaneously with making a change from one operating scenario to another, to record in a log at the permitted facility a record of the scenario under which it is operating at all times and may require the source to notify the Department at the time it implements the change.
(2) Shall extend the permit shield described in § 127.516 (relating to permit shield) to the terms and conditions under each operating scenario, unless precluded by the Clean Air Act or the regulations thereunder.
(3) Shall ensure and require that the terms and conditions of each alternate scenario meet applicable requirements of the Clean Air Act, the act and the regulations thereunder.
Cross References This section cited in 25 Pa. Code § 127.3 (relating to operational flexibility).
OPERATING PERMIT MODIFICATIONS
§ 127.461. Operating permit changes for cause.
An operating permit may be terminated, modified, suspended or revoked and reissued if one or more of the following applies:
(1) The permittee constructs or operates the source subject to the operating permit so that it is in violation of the act, the Clean Air Act, the regulations thereunder, a plan approval, a permit or in a manner that causes air pollution.
(2) The permittee fails to properly or adequately maintain or repair an air pollution control device or equipment attached to or otherwise made a part of the source.
(3) The permittee has failed to submit a report required by the operating permit or an applicable regulation.
This section cited in 25 Pa. Code § 127.3 (relating to operational flexibility); 25 Pa. Code § 127.14 (relating to exemptions); and 25 Pa. Code § 127.424 (relating to public notice).
§ 127.463. Operating permit revisions to incorporate applicable
standards.(a) The Department will require revisions to an operating permit to incorporate applicable standards or regulations promulgated under the Clean Air Act after the issuance of the permit.
(b) The revisions shall occur as expeditiously as practicable, but not later than 18 months after the promulgation of the standards or regulations.
(c) A revision will not be required if the effective date of the standards or regulations is a date after the expiration of the permit term or if less than 3 years remain in the permit term.
(d) A revision issued under this section shall be treated as a permit renewal if it complies with the act and the regulations promulgated thereunder regarding renewals.
(e) Regardless of whether a revision is required under this section, the permittee shall meet the applicable standards or regulations promulgated under the Clean Air Act within the time frame required by standards or regulations.
§ 127.464. Transfer of operating permits.
(a) An operating permit may not be transferred from one person to another except in cases of change-of-ownership which are documented and approved to the satisfaction of the Department.
(b) Section 127.412 (relating to compliance review forms) applies to a request to transfer an operating permit.
(c) An operating permit is valid only for that specific source and that specific location of the source as described in the permit.