![]()
Subchapter B. APPLICATION REQUIREMENTS FOR
TRANSFER FACILITIES
Sec.
293.101. General requirements.
293.102. Operating plan.
293.103. Maps and related information.
293.104. Plan for access roads.
293.105. Soil plan.
293.106. Soil and groundwater monitoring plan.
293.107. Nuisance control plan.
293.108. Litter control plan.
293.109. Contingency plan.
293.110. Daily volume.
293.111. Radiation protection action plan.
293.112. Notification of proximity to airport.§ 293.101. General requirements.
(a) An application to operate a transfer facility shall:
(1) Comply with the requirements of this subchapter.
(2) Comply with the applicable requirements of Chapter 287 (relating to residual waste managementgeneral provisions).
(b) Maps, plans and cross sections submitted to comply with this subchapter shall be on a scale in which 1 inch equals no more than 50 feet with 2-foot maximum contour intervals, unless otherwise approved by the Department.
§ 293.102. Operating plan.
(a) An application to operate a transfer facility shall contain a narrative description of the general operating plan for the proposed facility, including the origin, composition and weight or volume of solid waste that is proposed to be received at the facility, the process to be used at the facility, the daily operational methodology of the proposed process, the loading rate, the proposed capacity of the facility and the expected life of the facility.
(b) An application shall contain a plan for an alternative waste handling or disposal system during periods when the proposed facility is not in operation, including procedures to be followed in case of equipment breakdown. Procedures may include the use of standby equipment, extension of operating hours and contractual agreements for diversion of residual waste to other facilities.
(c) An application shall contain a plan for training equipment operators and other personnel concerning the operation and approved design of the facility, including safety measures to prevent injuries.
(d) An application shall contain a plan for assuring that solid waste received at the facility is consistent with § 293.201 (relating to basic limitations).
(e) An application shall contain the proposed operating hours of the proposed facility.
(f) An application shall contain a narrative describing the procedures for inspection and monitoring of incoming waste.
Source The provisions of this § 293.103 amended January 12, 2001, effective January 13, 2001, 31 Pa.B. 235. Immediately preceding text appears at serial pages (226830) and (266341).
Cross References This section cited in 25 Pa. Code § 287.135 (relating to transition period for radiation monitoring).
§ 293.104. Plan for access roads.
The application shall contain designs, cross sections and specifications for access roads, including load limits, under § 293.213 (relating to access roads).
Cross References This section cited in 25 Pa. Code § 293.213 (relating to access roads).
§ 293.105. Soil plan.
(a) The applicant shall submit a plan to manage surface water and control erosion during the phases of construction and operation on the permit area. The plan shall be based on the requirements of Chapter 102 (relating to erosion and sediment control), § 293.232 (relating to soil erosion and sedimentation control) and other applicable State and Federal requirements. Calculations indicating water quantities shall be based on the 24-hour precipitation event in inches to be expected once in 25 years.
(b) The plan shall include fully dimensioned diversion ditches, indicating length, gradient and cross section for configuration by reach, and capacities for ditch volume by reach. Calculations which are necessary to support design and siting shall be included in the plan.
(c) The application shall also contain a plan for the collection, disposal or treatment of rinse water and leachate from the facility.
§ 293.106. Soil and groundwater monitoring plan.
(a) If required by the Department, the applicant shall submit a groundwater monitoring plan to detect groundwater degradation from the facility.
(b) If required by the Department, the applicant shall submit a soil monitoring plan capable of detecting soil contamination from the facility.
Source The provisions of this § 293.106 amended January 12, 2001, effective January 13, 2001, 31 Pa.B. 235. Immediately preceding text appears at serial page (266342).
§ 293.107. Nuisance control plan.
The application shall contain a plan under § 293.219 (relating to nuisance control) to prevent and control hazards or nuisances from vectors, odors, noise, dust and other nuisances not otherwise provided for in the permit application. The plan shall provide for the routineassessment of vector infestation and shall also provide for countermeasures. The plan may include a control program involving a contractual arrangement for services with an exterminator.
§ 293.108. Litter control plan.
The application shall contain a plan in accordance with § 293.221 (relating to litter) to control litter.
§ 293.109. Contingency plan.
An application shall contain a contingency plan consistent with § § 293.241293.243 (relating to emergency procedures). The plan shall include a Preparedness, Prevention and Contingency (PPC) Plan that is consistent with the Departments most recent guidelines for the development and implementation of PPC Plans.
Source The provisions of this § 293.109 amended January 12, 2001, effective January 13, 2001, 31 Pa.B. 235. Immediately preceding text appears at serial page (266342).
Cross References This section cited in 25 Pa. Code § 298.45 (relating to waste oil storage at transfer facility).
§ 293.110. Daily volume.
The application shall contain a proposed maximum daily volume for the facility, and a detailed justification for the volume, based on § § 287.126 and 287.127 (relating to requirement for environmental assessment; and environmental assessment).
Source The provisions of this § 293.110 adopted January 12, 2001, effective January 13, 2001, 31 Pa.B. 235.
§ 293.111. Radiation protection action plan.
(a) An application for a noncaptive residual waste transfer facility shall contain an action plan specifying procedures for monitoring for and responding to radioactive material entering the facility, as well as related procedures for training, notification, recordkeeping and reporting.
(b) The action plan shall be prepared in accordance with the Departments Guidance Document on Radioactivity Monitoring at Solid Waste Processing and Disposal Facilities, Document Number 250-3100-001, or in a manner at least as protective of the environment, facility staff and public health and safety and which meets all statutory and regulatory requirements.
(c) The action plan shall be incorporated into the transfer facilitys approved waste analysis plan under § 287.134 (relating to waste analysis plan).
Source The provisions of this § 293.111 adopted January 12, 2001, effective January 13, 2001, 31 Pa.B. 235.
Cross References This section cited in 25 Pa. Code § 287.135 (relating to transition period for radiation monitoring); and 25 Pa. Code § 293.223 (relating to radiation monitoring and response for noncaptive residual waste transfer facilities).
§ 293.112. Notification of proximity to airport.
An applicant shall notify the Bureau of Aviation of the Department of Transportation, the Federal Aviation Administration and the airport if a proposed transfer facility or expansion is within 6 miles of an airport runway. The application must include a copy of each notification and each response to each notification received by the applicant.
Source The provisions of this § 293.112 adopted March 21, 2008, effective March 22, 2008, 38 Pa.B. 1357.
No part of the information on this site may be reproduced for profit or sold for profit.
This material has been drawn directly from the official Pennsylvania Code full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.