§ 33.212. Changes and additions.

 (a)  Every three months during construction the owner, contractor or superintendent of each cavern shall place or cause to be placed on the map or plan of the cavern deposited with the Department the plan of the extensions made in the cavern during the preceding year. These extensions shall be placed on the map or plan and a blueprint or copy of the map or plan returned to the Department within 2 months from the date of the last survey.

 (b)  When any cavern is completed or when any level or lift of any cavern is about to be abandoned, the owner, contractor or superintendent of the cavern shall either have the maps or plans extended to include all excavations, as far as practicable and all portions of excavation, as have been worked to the boundary lines of adjoining properties, or have any part surveyed in duplicate and these surveys shall practically agree, and certified copies shall be filed with the Department.



No part of the information on this site may be reproduced for profit or sold for profit.

This material has been drawn directly from the official Pennsylvania Code full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.