Subchapter C. INTERCONNECTION STANDARDS
GENERAL
75.21. Scope.
75.22. Definitions.
INTERCONNECTION PROVISIONS
75.31. Applicability.
75.32. Interconnection requests.
75.33. Fees and forms.
75.34. Review procedures.
75.35. Technical standards.
75.36. Additional general requirements.
75.37. Level 1 interconnection review.
75.38. Level 2 interconnection review.
75.39. Level 3 interconnection review.
75.40. Level 4 interconnection review.
DISPUTE RESOLUTION
75.51. Disputes.
GENERAL
§ 75.21. Scope.
This subchapter sets forth the interconnection standards that apply to EDCs which have customer-generators intending to pursue net metering opportunities in accordance with the act.
Cross References This section cited in 52 Pa. Code § 69.2101 (relating to statement of scope); 52 Pa. Code § 69.2102 (relating to statement of purpose); and 52 Pa. Code § 69.2104 (relating to interconnection application fees).
INTERCONNECTION PROVISIONS
§ 75.31. Applicability.
The interconnection procedures apply to customer-generators with small generator facilities that satisfy the following criteria:
(1) The electric nameplate capacity of the small generator facility is equal to or less than 2 MW.
(2) The small generator facility is not subject to the interconnection requirements of an RTO.
(3) The small generator facility is designed to operate in parallel with the electric distribution system.
Cross References This section cited in 52 Pa. Code § 69.2101 (relating to statement of scope); 52 Pa. Code § 69.2102 (relating to statement of purpose); and 52 Pa. Code § 69.2104 (relating to interconnection application fees).
§ 75.32. Interconnection requests.
Interconnection customers seeking to interconnect a small generator facility shall submit an interconnection request to the EDC that owns the electric distribution system to which interconnection is sought. EDCs shall establish processes for accepting interconnection requests electronically.
Cross References This section cited in 52 Pa. Code § 69.2101 (relating to statement of scope); 52 Pa. Code § 69.2102 (relating to statement of purpose); and 52 Pa. Code § 69.2104 (relating to interconnection application fees).
§ 75.33. Fees and forms.
The Commission will determine the appropriate interconnection fees for Levels 1, 2, 3 and 4. In circumstances when standard forms are used for the interconnection process, examples of those forms shall be posted on the EDCs websites.
Cross References This section cited in 52 Pa. Code § 69.2101 (relating to statement of scope); 52 Pa. Code § 69.2102 (relating to statement of purpose); 52 Pa. Code § 69.2103 (relating to definitions); and 52 Pa. Code § 69.2104 (relating to interconnection application fees).
§ 75.34. Review procedures.
An EDC shall review interconnection requests using one or more of the following four review procedures:
(1) An EDC shall use Level 1 procedures for evaluation of all interconnection requests to connect inverter-based small generation facilities when:
(i) The small generator facility has an electric nameplate capacity of 10 kW or less.
(ii) The customer interconnection equipment proposed for the small generator facility is certified.
(2) An EDC shall use Level 2 procedures for evaluating interconnection requests to connect small generation facilities when:
(i) The small generator facility uses an inverter for interconnection.
(ii) The electric nameplate capacity rating is 2 MW or less.
(iii) The customer interconnection equipment proposed for the small generator facility is certified.
(iv) The proposed interconnection is to a radial distribution circuit, or a spot network limited to serving one customer.
(v) The small generator facility was reviewed under Level 1 review procedures but not approved.
(3) An EDC shall use Level 3 review procedures for evaluating interconnection requests to connect small generation facilities with an electric nameplate capacity of 2 MW or less which do not qualify under Level 1 or Level 2 interconnection review procedures or which have been reviewed under Level 1 or Level 2 review procedures, but have not been approved for interconnection.
(4) Interconnection customers that do not qualify for Level 1 or Level 2 review and do not export power beyond the point of common coupling may request to be evaluated under Level 4 review procedures which provide for a potentially expedited review process.
Cross References This section cited in 52 Pa. Code § 69.2101 (relating to statement of scope); 52 Pa. Code § 69.2102 (relating to statement of purpose); 52 Pa. Code § 69.2104 (relating to interconnection application fees); and 52 Pa. Code § 75.37 (relating to level 1 interconnection review); and 52 Pa. Code § 75.38 (relating to review procedures).
§ 75.35. Technical standards.
The technical standards to be used in evaluating all interconnection requests under Level 1, Level 2, Level 3 and Level 4 reviews, unless otherwise provided for in these procedures, are IEEE 1547 and U. L. 1741, as they may be amended and modified.
Cross References This section cited in 52 Pa. Code § 69.2101 (relating to statement of scope); 52 Pa. Code § 69.2102 (relating to statement of purpose); 52 Pa. Code § 69.2103 (relating to definitions); and 52 Pa. Code § 69.2104 (relating to interconnection application fees).
DISPUTE RESOLUTION
§ 75.51. Disputes.
(a) A party shall attempt to resolve all disputes regarding interconnection as provided in this chapter promptly, equitably, and in a good faith manner.
(b) When a dispute arises, a party may seek immediate resolution through complaint procedures available through the Commission, or an alternative dispute resolution process approved by the Commission, by providing written notice to the Commission and the other party stating the issues in dispute. Dispute resolution will be conducted in an informal, expeditious manner to reach resolution with minimal costs and delay. When available, dispute resolution may be conducted by phone.
(c) When disputes relate to the technical application of this chapter, the Commission may designate a technical master to resolve the dispute. The Commission may designate a Department of Energy National laboratory, PJM Interconnection L.L.C., or a college or university with distribution system engineering expertise as the technical master. When the Federal Energy Regulatory Commission identifies a National technical dispute resolution team, the Commission may designate the team as its technical master. Upon Commission designation, the parties shall use the technical master to resolve disputes related to interconnection. Costs for dispute resolution conducted by the technical master shall be determined by the technical master subject to review by the Commission.
(d) Pursuit of dispute resolution may not affect an interconnection applicant with regard to consideration of an interconnection request or an interconnection applicants position in the EDCs interconnection queue.
Cross References This section cited in 52 Pa. Code § 69.2101 (relating to statement of scope); 52 Pa. Code § 69.2102 (relating to statement of purpose); and 52 Pa. Code § 69.2104 (relating to interconnection application fees).
No part of the information on this site may be reproduced for profit or sold for profit.
This material has been drawn directly from the official Pennsylvania Code full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.